HALCYON MACHINERY — C PURLIN MACHINE QUOTATION COMPARISON Updated 2 October 2026 | Buyer working document, not a quotation Copy one blank form for each written supplier offer. Supplier / actual manufacturing company: Offer reference / date / validity: Named machine build: Currency: Approved C drawing numbers and revisions: Steel grade / coating / thickness / coil width: Fixed or adjustable size scope / supplied toolsets: Hole layout / datum / cut-length schedule: Batch mix / changes per shift / accepted-output requirement: For each item below enter INCLUDED / OPTIONAL / EXCLUDED / PENDING, the written scope, price if stated, and the supplier document reference. Base machine and supplied tooling: Decoiler: Guiding / leveling: Punching: Cut-off: Outfeed / stacking: Electrical supply and destination configuration: Trial samples / measurements / agreed acceptance: Commissioning and installation: Training / manuals: Spare parts: Warranty terms / service location / exclusions: Packing: Delivery term and named place: Freight / insurance: Import duty / taxes / local transport requiring confirmation: Recorded trial conditions / finished accepted parts / elapsed time: Time and material used for size changes: Unresolved scope differences: Supplier clarification requested / date: Buyer review / date: Do not add prices across different currencies or delivery bases. Leave unknown amounts pending; they are not zero. Catalogue forming speed does not guarantee punched, cut output per shift. Confirm commercial terms and acceptance in the written project documents.